EIC Forums 2004
EIC Forums 2004
Home | Profile | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

  Forum Topics Posts Last Post Moderator(s)  
Collapse This Category EIC Information    
Forum Locked Draft Notification for re-engineers EC process
A need had been felt to re-engineer the existing EIA notification (dated 27th January, 1994). MoEF has been working on the re-engineered Environment Clearance process for past 3 years and a draft new process has been notified for receiving objections and suggestions from stake holders. The draft re-engineered notification has many fundamental differences from the existing one. This forum desires to discuss various issues arising of the draft notification and suggest modifications required for implementable sustainable developmen
1 2 11/17/2005
12:47:56
by: darshanvaidya
   
Statistics
  687 of 1349 Members have made 2 posts in 1 forum, with the last post on 11/17/2005 12:47:56 by: darshanvaidya.
There is currently 1 topic.
Please welcome our newest member: SeanXO.
New Posts Contains new posts since last visit.
Old Posts No new posts since the last visit.
EIC Forums 2004 © 2004-05 EIC Go To Top Of Page
Powered By: Continuum-systems