EIC Forums 2004
EIC Forums 2004
Home | Profile | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password
Forgot your Password?

  Forum Topics Posts Last Post Moderator(s)  
Collapse This Category EIC Information    
Forum Locked Draft Notification for re-engineers EC process
A need had been felt to re-engineer the existing EIA notification (dated 27th January, 1994). MoEF has been working on the re-engineered Environment Clearance process for past 3 years and a draft new process has been notified for receiving objections and suggestions from stake holders. The draft re-engineered notification has many fundamental differences from the existing one. This forum desires to discuss various issues arising of the draft notification and suggest modifications required for implementable sustainable Garden
Plants
1 2 11/17/2005
12:47:56
by: darshanvaidya
   
Statistics
  687 of 1349 Members have made 2 posts in 1 forum, with the last post on 11/17/2005 12:47:56 by: darshanvaidya.
There is currently 1 topic.
Please welcome our newest member: SeanXO.
New Posts Contains new posts since last visit.
Old Posts No new posts since the last visit.
EIC Forums 2004 © 2004-05 EIC Go To Top Of Page
Powered By: Continuum-systems